Brief Case

29 C.F.R. § 4043.6

Date of filing.
CFR 2015 annual edition (revised as of 2015-07-01) · superseded Jul 1, 2016 · last amended by 68 FR 61354, Oct. 28, 2003
Back to current
Historical text in effect Jul 1, 2004 through Jun 30, 2016. View current · Compare with current
(a) Post-Event notice filings. The PBGC applies the rules in subpart C of part 4000 of this chapter to determine the date that a submission under subpart B of this part was filed with the PBGC.
(b) Advance notice and Form 200 Filings. Information filed under subpart C or D of this part is treated as filed on the date it is received by the PBGC. Subpart C of part 4000 of this chapter provides rules for determining when the PBGC receives a submission.
(c) Partial electronic filing; deemed filing date. A reportable event notice or Form 200 will be deemed timely filed if—
(1) An electronic transmission containing at least the minimum initial information (as specified in the instruction to the applicable form) is filed on or before the notice date; and
(2) The remaining initial information is received by the PBGC on or before—
(i) The first regular business day following the notice date, in the case of advance notice or a Form 200; or
(ii) The second regular business day following the notice date, in the case of post-event notice.
Source credit, amendments & notes

[61 FR 63989, Dec. 2, 1996, as amended at 68 FR 61354, Oct. 28, 2003]

29 C.F.R. § 4043.6 — Date of filing. · CFR 2015 annual edition (revised as of 2015-07-01) · https://pensionresource.website/EAMain?content=EAMain.Law&id=cfr29-4043.6&asof=2007-01-03 · printed Oct 16, 2026
On this page
  • (a) Post-Event notice filings.
  • (b) Advance notice and Form 200 Filings.
  • (c) Partial electronic filing; deemed filing date.
Implements
Guidance addressing this section

No documents are primarily about this section.

Also cited in 2 other documents
PBGC
Final Rules
  • 80 FR 54980 Sep 11, 2015 — Reportable Events and Certain Other Notification Requirements
Proposed Rules
  • 78 FR 20039Proposed Apr 3, 2013 — Reportable Events and Certain Other Notification Requirements Comments due Jun 3, 2013

No court rulings in the library cite this provision yet.

No private letter rulings in the library cite this provision yet.

Each row is a version of the text as published by the official source. Code dates are the edition/release point that first reflected the change; regulation dates are eCFR effective dates. The library checks the official sources automatically, so new versions appear here on their own; “run” opens the sync that recorded a version.

EffectiveThroughSourceAmended by
Jul 1, 1997Jun 30, 2004CFR 2003 annual edition (revised as of 2003-07-01) run 127View
Jul 1, 2004Jun 30, 2016CFR 2015 annual edition (revised as of 2015-07-01) run 12768 FR 61354, Oct. 28, 2003View · Redline (sign in)
Jul 1, 2016currenteCFR amendment effective 2017-01-01 run 2View · Redline (sign in)
Provision-level history (blame)